Under Bridge Drainage C2C Project Gympie

Two workers are on elevated platforms, inspecting or repairing the underside of a large concrete bridge. The platforms are supported by long, mechanical arms. Below the bridge, there's a forested area with trees and a pile of rocks. The sky is clear and blue.
Client
Bielby a JV
Location
Gympie

During the construction of a key infrastructure project, the para walls of one bridge were completed before the installation of the underbridge drainage system. This premature completion created a significant challenge, as it severely restricted access to critical areas needed for installing the drainage system. The situation demanded innovative solutions to ensure the drainage could be effectively implemented without compromising the structural integrity and safety standards required for such a significant civil engineering project.

Ground One Civil promptly addressed the oversight by deploying a team of specialists experienced in complex drainage systems. Recognising the unique challenges posed by the restricted access and the critical nature of the task, our team devised bespoke solutions to facilitate the installation process under challenging conditions. This included the use of specialised equipment and techniques tailored to work within the confined spaces, ensuring that the project remained on track. Our proactive and strategic response underscored our commitment to providing expert solutions in even the most demanding scenarios.

The expertise and adaptability of Ground One Civil's team culminated in the successful installation of the underbridge drainage system, despite the initial setbacks and the complex nature of the work. The project's completion was met with approval from the relevant authorities, confirming compliance with all engineering and safety standards. This achievement not only highlighted our technical proficiency but also reinforced our reputation for delivering reliable results under pressure, ensuring client satisfaction and project success.

  • Deployed specialists to manage complex underbridge drainage installation in restricted areas.
  • Utilised bespoke techniques and equipment to adapt to confined space challenges.
  • Achieved successful project approval, demonstrating adaptability and technical proficiency under pressure.